One trade for the power and everything it runs.
Licensed electrical and luxury technology under one roof, with our owner involved from the first plan review to the final walkthrough.
Fewer trades on site. Fewer surprises at trim.
On most luxury builds the electrician, the AV company, the lighting-control programmer, and the shade installer each work to their own drawings. We’re all of them.
Our licensed electricians and integrators plan and wire power and low-voltage together, so rack locations, shade pockets, keypad stations, and circuits are resolved on paper instead of in the field.
Bring us in at design stage and we’ll help you get the infrastructure right the first time.
Built to make your schedule easier.
Early design & plan review
We review plans at design stage for power, low-voltage, shade pockets, equipment rack location, and theater dimensions, before anything is framed.
Lighting & load planning
Lighting control layouts and keypad schedules, plus electrical load and service sizing, generators and transfer switches included.
One trade for power and low-voltage
Our licensed electricians and integrators wire everything together, so there’s one crew to schedule and one company accountable.
Spec sheets & budgets
Budget ranges and product specs you can put in front of your clients early, so technology decisions don’t hold up the job.
The owner at every milestone
Our owner is involved from plan review through commissioning, so you always know who’s responsible for the work.
Clean, documented rough-in
Organized, labeled wiring and panels that make inspection, trim, and every future service call easier.
From plans to final walkthrough.
- 01
Plan review
We walk the plans with you and the client, and flag power, low-voltage, and structural needs early.
- 02
Design & budget
System design, lighting and keypad layouts, specs, and a budget your client can approve.
- 03
Rough-in
Electrical and low-voltage wired together, on your schedule, ready for inspection.
- 04
Trim & install
Devices, fixtures, shades, speakers, screens, and equipment go in as finishes are complete.
- 05
Commissioning & handoff
Everything is programmed, tested, and walked through with the homeowner before move-in.
The work you don’t see, done right.